Home > Business > Civil Works > Harbors

Harbors

Overview

POSCO E&C is rethinking harbor projects by offering environmentally-friendly, people-oriented design and construction to enable to live in affluence and convenience. We have trained experts in every area required to construct harbors, the gateways to the global market.

We have continued to develop new technologies and methods, including floating breakwaters and curtain-type breakwaters that are making a significant contribution to the development of harbor technology. POSCO E&C has successfully built the Weonjeon Harbor, equipped with the nation's first steel floating breakwaters, and Busan Haegyeong Harbor, which features curtain type breakwaters.

Key Projects

  • Caimep International terminal

    Caimep International terminal

    ◆ Project period: Jul. 2007 ~ Apr. 2011
    ◆ Location: Ba-Ria Vung Tau, Vietnam
    ◆ Main structure
    - Container yard: 480,000㎡
    - Quay: 600m (80,000ton X 2 berths)

    레이어 닫기
  • Busan International Ferry Terminal and Pier

    Busan International Ferry Terminal and Pier

    ◆ Project period: Dec. 2002 ~ Jun. 2006
    ◆ Main structure
    - Pier 525m
    - Bank protection 200m
    - Breakwater 150m

    레이어 닫기
  • Incheon New Port Access Road and Share Protection Works(2nd area)

    Incheon New Port Access Road and Share Protection Works(2nd area)

    ◆ Project period: Nov. 2009 ~ Nov. 2012
    ◆ Location
    - Songdo New city South sea area, Songdo-dong, Yeonsu-gu, Incheon, Republic of Korea
    ◆ Main structure
    - Access Road Length: 6,390M
    - Shore Protection work : East side 425M, Dock temperary dike : 810M
    - Cable Stayed Bridge : 431M

    레이어 닫기
  • Pohang New Port, the Pier No.1 and Wharf No3. Rebuilding and Passage Dredging Project

    Pohang New Port, the Pier No.1 and Wharf No3. Rebuilding and Passage Dredging Project

    ◆ Project period: June. 2010 ~ July. 2013
    ◆ Location
    - Pohang New Port, Song-Jeong-Dong, Nam-Gu,, Pohang, Korea, Republic of Korea
    ◆ Main structure
    - The Pier No.1(#14 Berth) Building PJT: Length: 370M, Dredging Level : DL.(-)19.3M (200,000DWT class)
    - The Wharf No.3 Building PJT: Length : 539M, Dredging Level : DL.(-)9.0~12.0M (2 Berths in the 5,000DWT class and 1 Berth in the 30,000DWT class)
    - The Passage Dredging PJT
    Dredging Area : 1,814,693M2, Quantity : 2,827,653M3

    레이어 닫기
  • Ulleung(Sadong) Port Phase 2 East Breakwater, Korea

    Ulleung(Sadong) Port Phase 2 East Breakwater, Korea

    ◆ Project period: Feb. 2014 ~ Jun. 2018

    ◆ Main structure:
    - Length: East Breakwater 640m
    - 3 Drain routes

    레이어 닫기
  • Saemangeum New Port Breakwater, Korea

    Saemangeum New Port Breakwater, Korea

    ◆ Project period: Dec. 2011 ~ Oct. 2016

    <Construction sector Ⅱ>
    ◆ Main structure:
    - Length: East Breakwater 640m, Fishery Protection Facility 300m

    레이어 닫기
  • Samcheok thermal power plant 1 & 2 subsidiary engineering works Korea

    Samcheok thermal power plant 1 & 2 subsidiary engineering works Korea

    ◆ Project period: Aug. 2017 ~ Sep. 2023
    ◆ Main structure
    - Ground work: 0.63 million m²
    - Tunnel: 7.5km (4ea)
    - Harbors: Breakwater 1.5km, Loading pier 400m, Access trestle 1.2km