In port construction, POSCO E&C has been committing its best efforts to make the design environment-friendly and people-centered, enhancing the quality of living. POSCO E&C has been training its professionals in various areas for port construction that serves as gateways to the world market.
n addition, POSCO E&C has been consistently developing new technologies and engineering techniques such as floating breakwaters and curtain breakwaters to contribute to the progress of harbor technologies. POSCO E&C holds the record of completing the construction of Wonjeon Fishery Port with Korea 's first steel floating breakwater, and Busan International Passenger Port , which features a curtain breakwater.


| Project period |
Jul. 2007 ~ Apr. 2011 |
| Location |
Ba-Ria Vung Tau, Vietnam |
| Main structure |
Container yard |
480,000㎡ |
| Quay |
600m (80,000ton X 2 berths) |

| Project period |
Dec. 2002 ~ Jun. 2006 |
| Main structure |
Pier 525m
Bank protection 200m
Breakwater 150m
|

| Project period |
Nov. 2009 ~ Nov. 2012 |
| Location |
Songdo New city South sea area, Songdo-dong, Yeonsu-gu, Incheon, Republic of Korea |
| Main structure |
- - Access Road Length: 6,390M
- - Shore Protection work : East side 425M, Dock temperary dike : 810M
- - Cable Stayed Bridge : 431M
|

| Project period |
June. 2010 ~ July. 2013 |
| Location |
Pohang New Port, Song-Jeong-Dong, Nam-Gu,, Pohang, Korea, Republic of Korea |
Main structure
| The Pier No.1(#14 Berth) Building PJT |
Length: 370M, Dredging Level : DL.(-)19.3M (200,000DWT class) |
| The Wharf No.3 Building PJT |
Length : 539M, Dredging Level : DL.(-)9.0~12.0M (2 Berths in the 5,000DWT class and 1 Berth in the 30,000DWT class) |
| The Passage Dredging PJT |
Dredging Area : 1,814,693M2, Quantity : 2,827,653M3 |