 |
|
|
|
|
|
 |
|
| |
|
|
|
|
 |
|
 |
|
 |
 |
|
 |
49 sqare, Namcheon-Dong, Suyoung-Ku, Pusan ~ Woo-Dong, Haeundae-Ku |
| |
|
720m |
80m |
22,604 ton |
271 ar |
|
|
|
 |
 |
 |
|
Oksung-Myun, Kumi city, Kyungbuk |
|
| |
Construction of inland highway in the central part of the country |
| (16 blocks, L=7.7 km, 4 lanes) |
|
13 Bridges, Sunsan Rest Area, Sunsan Interchange |
|
|
 |
|
 |
|
|
|
|
|
|
|
|
| Taebaek~Miro Highway (2-2nd section) |
2007.02.12 ~ 2012.01.17 |
| Length : 7.86km
13 Bridges : 1,640m
5 Tunnels : 2,260m |
|
|
|
|
| Jeonju~Kwangyang Highway line no.27 (8th section) |
2005.03.31 ~ 2012.03.31 |
| Length : 12.13km
Bridges : 830m
Tunnels : 4,300m |
|
|
|
|
| Mooan~Kwangju Highway line no.12 (4th section) |
2002.12.24 ~ 2007.12.31 |
| 4 lanes / 8.76km
14 Bridges : 1,614m
1 Tunnel : 1,185m |
|
|
|
|
| Seocheon~Kongju Highway line no.17 (4th section) |
2001.12.27 ~ 2009.12.31 |
| 4 lanes / 10.244km
13 Bridges : 1,520m |
|
|
|
|
| Kimcheon~Yeongdong Highway line no.1 expansion (2nd section) |
2001.12.10 бн 2006.12.06 |
| 4 lanes -> 6 lanes, 7.74km
8 Bridges: 279m |
|
|
|
|
| Kilho bridge |
2000.7.31 ~ 2003.12.31 |
| 6 lanes / 0.64km
Connection part : 1,411m |
|
|
|
|
| Donghae~Jumunjin East sea Highway expansion |
2000. 03 ~2004.12 |
| 4 lanes 3.13km
5 Bridges(2 ILM + 1 FCM + 2 PSC~BEAM) : 1,460m
1 Tunnel : 525m |
|
|
|
|
| Daegu~Pohang Highway (3rd section) |
1998.10.17 ~ 2003.06.25 |
| Length : 3.48km
4 Bridges: 1,220m |
|
|
|
|
| Hyungsan bridge |
1997. 12 ~ 2000. 12 |
| Steel Box Girder : 390m
Steel Plate Girder : 30m |
|
|
|