Our BusinessDomestic AchievementCivil
 
 
 
49 sqare, Namcheon-Dong, Suyoung-Ku, Pusan ~ Woo-Dong, Haeundae-Ku
 
720m
80m
22,604 ton
271 ar
Oksung-Myun, Kumi city, Kyungbuk
  Construction of inland highway in the central part of the country
(16 blocks, L=7.7 km, 4 lanes)
13 Bridges, Sunsan Rest Area, Sunsan Interchange
 Taebaek~Miro Highway (2-2nd section) 2007.02.12 ~ 2012.01.17
Length : 7.86km 13 Bridges : 1,640m 5 Tunnels : 2,260m
 Jeonju~Kwangyang Highway line no.27 (8th section) 2005.03.31 ~ 2012.03.31
Length : 12.13km Bridges : 830m Tunnels : 4,300m
 Mooan~Kwangju Highway line no.12 (4th section) 2002.12.24 ~ 2007.12.31
4 lanes / 8.76km 14 Bridges : 1,614m 1 Tunnel : 1,185m
 Seocheon~Kongju Highway line no.17 (4th section) 2001.12.27 ~ 2009.12.31
4 lanes / 10.244km 13 Bridges : 1,520m
 Kimcheon~Yeongdong Highway line no.1 expansion (2nd section) 2001.12.10 бн 2006.12.06
4 lanes -> 6 lanes, 7.74km 8 Bridges: 279m
 Kilho bridge 2000.7.31 ~ 2003.12.31
6 lanes / 0.64km Connection part : 1,411m
 Donghae~Jumunjin East sea Highway expansion 2000. 03 ~2004.12
4 lanes 3.13km 5 Bridges(2 ILM + 1 FCM + 2 PSC~BEAM) : 1,460m 1 Tunnel : 525m
 Daegu~Pohang Highway (3rd section) 1998.10.17 ~ 2003.06.25
Length : 3.48km 4 Bridges: 1,220m
 Hyungsan bridge 1997. 12 ~ 2000. 12
Steel Box Girder : 390m Steel Plate Girder : 30m