| Sintering plant mixes fine iron ore with coke and lime to form lumps, then cools and crushes to the required granularity by blast furnace, mostly between 5 mm and 50 mm.
Based on its accumulated technologies and experiences, POSCO E&C has been currently executing engineering, procurement, construction and commissioning for sintering facilities at home and overseas, including the sintering plants in Pohang and Gwangyang, the revamping project for a BSL sintering plant in Australia and the new sintering plant for TAVAZON project in Esfahan , Iran .
|
|
 |
|
 |
 |
| Australia BSL Project |
 |
| |
BSL project was performed to replace worn out equipment in accordance with increasing productivity(+1,100,000T/Y, 20%UP) and long term operation in BSL No. 3 Sinter plant Australia (5,500,000 T/Y).
|
Project period: Feb. 2007 ~ Apr. 2009 |
Effective suction area: 420m² → 480m² |
Production: 15,000 T/D c 18,000 T/D |
Productivity: 40.5 T/D/m² |
Availability: 93 % |
|
|
 |
 |
| No. 2 Sintering Plant Revamping, Gwangyang steelworks |
 |
| |
This RMHF(Raw Material Handling Facility) is to provide coke, iron ore and sub-materials into newly installed FINEX(1.5 millions T/Y) in Pohang Steelworks. It includes material yard, stacker/reclaimer, belt conveyor, crushing and screening equipments and etc.
|
Project period: Jun. 2006 ~ Dec. 2007 |
Effective suction area: 450m² |
Production: 15,200 T/D → 18,000 T/D |
Productivity: 34T/D/m² → 40 T/D/m² |
Availability: 98.4 % → 99 % |
Bed Height: 850 mm → 1,000 mm |