Seongnam-Yeoju Vehicle Depot Construction Project

Serving as a base that forms the foundation of train operations by supporting the trains running on the routes.

The Seongnam-Gwangju-Yeoju Double-Track Railway is a 57km-long construction project that serves as a metropolitan railway network. Key stations such as Pangyo, Imae, Samdong, Gwangju, Ssangdong, Gonjiam, Sindun, Icheon, Bubal, Neungseo, and Yeoju connect the southern metropolitan line, Pyeongtaek-Wonju line, and Chungbuk-Yeongnam region, linking to the Jungbu Naeryuk Line.

POSCO E&C carried out the vehicle depot section of the Seongnam-Yeoju Double-Track Railway Bubal Vehicle Depot construction project, successfully executing the construction with a project budget of 155.4 billion KRW from the end of 2012 to the end of March 2017.

The business purpose is to inspect and stable general electric trains and trunk-line electric trains operating on the Seongnam-Yeoju double-track and Jungbu Naeryuk lines.
The project's facilities have a length of 1,135 km and an area of 197,419 m², equipped with stabling facilities for 12 trains and inspection facilities for 18 trains.
Truly serving as a base that forms the foundation of train operations by supporting the trains running on routes such as the Jungbu Naeryuk Line and east-west trunk railway network cutting through the center of South Korea.
 

  • Period
    Period
    2012.12 - 2017.03
  • Place of order
    Place of order
    Korea Rail Network Authority
  • Construction details
    Construction details
    - Site Area: 278,436 m²
    - Access Line: 1.84 km
    - Vehicle Depot: 1.13 km
    - Stabling Tracks: 12 trains (based on 6 cars per train)
    - Facilities: Inspection, architecture, electrical, machinery, signaling, and telecommunications
  • Location
    Location
    Icheon-si, South Korea

Personal Data Processing Policy Legal Disclaimer