Second Gyeongin Connection (Anyang–Seongnam) Highway Private Investment Project Section 2

Great Help in Alleviating Traffic Congestion in the Southern Metropolitan Area through the Distribution of Traffic Demand

The Anyang–Seongnam Expressway project section spans from Seoksu-dong, Manan-gu, Anyang-si, Gyeonggi-do to Yeosu-dong, Jungwon-gu, Seongnam-si, with a total project length of 21.82 km (12.17 km of 4 lanes, 9.65 km of 6 lanes) and a total investment cost of 1.0512 trillion KRW (633.5 billion KRW from private capital, 39.77 billion KRW from the national treasury for compensation fees). POSCO E&C carried out Section 2.

The Anyang–Seongnam Expressway is expected to greatly help alleviate traffic congestion in the southern metropolitan area by distributing traffic demand from National Route 57 and the Seoul Outer Ring Expressway. Furthermore, by connecting the Second Gyeongin Expressway and the Seongnam–Janghowon Road, it reduces travel time and operating costs, and contributes to promoting regional development by connecting the four local governments of Anyang, Uiwang, Gwacheon, and Seongnam.
 

  • Period
    Period
    2012.05 - 2017.09
  • Place of order
    Place of order
    Second Gyeongin Connection Highway Co., Ltd.
  • Construction details
    Construction details
    - Length: L = 3.065 km (6 lanes)
    - Tunnel: 1 location / 2,083 m
    - Bridge: 1 location / 531 m
    - Toll Plaza: 1 location
  • Location
    Location
    Gwacheon-si, South Korea